**** This Week Thru Your M43 (November 3, 2012) ****

Started Nov 3, 2012 | Discussions thread
Bill Wallace
Veteran MemberPosts: 6,235Gear list
Like?
Re: **** This Week Thru Your M43 (November 3, 2012) ****
In reply to SLOtographer, Nov 3, 2012

The Lowery Bridge just completed after 4 1/2 years of construction. They did a nice job but took forever. The bridge joins 2 sides of the Mississippi River in North Minneapolis. The next bridge down river was/is also under construction so a lot of people are happy now...

Looking across the bridge from east to west....

I am probably drawn more to the b&w shot. Opinions welcome.

All shot with the omd and 12-35.....

Cheers,

Bill

-- hide signature --

Bill Wallace
http://bwallace.zenfolio.com/
"Mister I ain't a boy no I'm a man
And I believe in a promised land"....

 Bill Wallace's gear list:Bill Wallace's gear list
Olympus OM-D E-M5 Olympus E-M1 Olympus M.Zuiko Digital ED 9-18mm 1:4.0-5.6 Panasonic Leica D Summilux Asph 25mm F1.4 Olympus M.Zuiko Digital ED 75-300mm 1:4.8-6.7 +4 more
Reply   Reply with quote   Complain
Post (hide subjects)Posted by
Keyboard shortcuts:
FForum PPrevious NNext WNext unread UUpvote SSubscribe RReply QQuote BBookmark post MMy threads
Color scheme? Blue / Yellow